Interoperability Agent
DICOMweb Imaging Exchange Test Kit
SCRIMED conformance evaluations execute deterministic checks against synthetic fixtures and declared connector contracts. A synthetic pass is not certification, partner acceptance, production authorization, or permission to exchange live healthcare data.
Deterministic checks
DICOM current edition with deployment-scoped DICOMweb services
Synthetic imaging fixture present
synthetic · fixture
- A deterministic imaging metadata fixture is bound to the DICOM contract.
DICOMweb service coverage
synthetic · service
- Synthetic scope declares query, retrieve, and store service families.
Metadata and pixel-data separation
synthetic · privacy
- The current fixture validates metadata workflows without production image or pixel data.
Diagnostic interpretation prohibited
synthetic · clinical-safety
- The connector may exchange approved artifacts but cannot interpret images or issue diagnosis.
Deterministic fixture validation
synthetic · quality
- Required imaging signals, safeguards, trace, prohibited actions, and review gates must pass.
DICOM Part 2 conformance statement
live-readiness · conformance
- Retain a deployment-specific conformance statement covering supported roles and services.
Transfer syntax and de-identification tests
live-readiness · security
- Validate accepted transfer syntaxes, metadata handling, de-identification, and failure behavior.
Identity, consent, audit, and security profile
live-readiness · governance
- Approve endpoint identity, purpose-of-use, consent, audit linkage, and applicable IHE security profiles.
Synthetic DICOMweb fixture
Metadata-only request with QIDO-RS, WADO-RS, STOW-RS, and prohibited diagnostic interpretation.
Inspect evidenceIntegration fixture validation
10 deterministic checks currently pass.
Inspect evidenceDICOM Part 2 conformance statement
Deployment roles, services, transfer syntaxes, security, and limitations.
Partner DICOMweb acceptance report
Endpoint, service, transfer syntax, de-identification, error, and audit tests.
Required before live exchange
Production use remains denied until every deployment-specific blocker is resolved.
Linked controls
Contract, fixture, and standards evidence remain inspectable.
Primary sources